Spire Manchester - Gatwick - Laboratory Furniture - Plug Sockets Cabinets
Spire Manchester - Gatwick - Laboratory Furniture - Cabinets Sinks Plug Sockets

Contract Value:  £185,000
Completed:- March, 2009
Location:- Gatwick

    • Full Internal Fit-out inc Mechanical & Electrical Services
    • Cantilever Laboratory Furniture
    • Mobile Units
    • HVAC and Air Conditioning Equipment
    • AFOS Downdraft Bench

The project was an occupied building requiring iab to design and convert four patient bedrooms into a laboratory with a Histology Cut Up room and open plan laboratory for Histology, Haematology, Blood Transfusion and Sample Reception.  This was a compact project which was not only demanding on space but required iab to carry out the project with patient occupation in adjacent bedrooms.  The contract included a high level of demolition, builders work to restructure the area and the installation a ventilation system and ductwork in a confined spaces. The contract was completed in eight weeks and to budget.

Contract Value:  £185,000 Completed:- March, 2009 Location:- Gatwick Full Internal Fit-out inc Mechanical & Electrical Services Cantilever Laboratory Furniture Mobile Units HVAC and Air Conditioning Equipment AFOS Downdraft Bench The project was an occupied building requiring iab to design and convert four patient bedrooms into a laboratory with a Histology Cut Up room and open […]