C4988 - Alere Loughton - Full Refurb - Laboratory Cabinets Drawers Shelving
C4988 - Alere Loughton - Laboratory Reburbishment - Lab Workspace Drawers Cabinets Computers Lab Equipment

Contract Value:- £1,520,300
Completed:- December 2014
Location:- East London

    • Complete Turnkey Laboratory Refurbishment
    • All Fixtures And Fittings
    • All M&E Services
    • Full HVAC System
    • Special Gas Services
    • Specialist Water Plant
    • Nitrogen Generator Equipment
    • Pumped Drainage Systems
    • Large +5c Cold Room And -20c Freezer Room

One of iab’s regular and valued client was moving their drugs testing lab. As part of this major relocation iab were appointed to design and construct a series of new laboratories and offices to accommodate the existing business and provide space for expansion. The £1.5million project was designed and built to a tight program, 20 weeks in total including the demolition of the existing interior fit out and the installation of the new areas complete with all fixtures and fittings; M&E, HVAC, special gas services, specialist water plant, nitrogen generator equipment, pumped drainage systems, large cold room and freezer room and first floor offices and meeting rooms for 80 to 100 staff. This project represents a major investment for one of iab’s leading customers and marks a major turning point for iab in its development and target to become a leader in the laboratory design and build market.

Contract Value:- £1,520,300 Completed:- December 2014 Location:- East London Complete Turnkey Laboratory Refurbishment All Fixtures And Fittings All M&E Services Full HVAC System Special Gas Services Specialist Water Plant Nitrogen Generator Equipment Pumped Drainage Systems Large +5c Cold Room And -20c Freezer Room One of iab’s regular and valued client was moving their drugs testing […]