Toxicology Laboratory

Toxicology Laboratory

Contract Value:- £4,100,000
Completed:- January 2018
Location:- Abingdon, Oxford

  • Complete Turnkey Toxicology Laboratory & Office Refurbishment
  • All Fixtures And Fittings
  • All M&E Services
  • Full HVAC System
  • Special Gas Services
  • Specialist Water Plant
  • Nitrogen Generator Equipment
  • Pumped Drainage Systems
  • Large +5c Cold Room And -20c Freezer Room

iab’s motto of maintaining a close working relationship with its clients is demonstrated in this £4.1 million design and build Toxicology Laboratory in Oxfordshire. The project involved the conversion of a large warehouse facility into a series of offices on a new mezzanine floor, laboratory space on the ground floor below the mezzanine and development of a large warehouse. At the front of the building, an existing ground and first-floor office area was refurbished to suit the client’s requirements. The project was carried out over a nine-month period and was completed on time and budget.

The project disciplines were:

  • 9-metre high double block work and jumbo stud warehouse/ office and laboratory wall
  • Steel framed and fireproofed mezzanine floor to support open-plan offices, managers offices, and meeting rooms.
  • Comprehensive external concrete plant base Galvanised internal and external plant gantry
  • Full mechanical and electrical installation, door access control, intruder and fire alarm system, External CCTV system.
  • Comprehensive HVAC installation.
  • Walk-in fridge and freezers.
  • Laboratory furniture and recirculating filtered fume cupboards.
  • Nitrogen generation plant with cylinder back, distribution pipework and drop point regulators.
  • Clean compressed air supply via nitrogen generator.
  • Bottled helium supply and pipework distribution.
  • Triple Red specialist water plant and distribution pipework.
  • Due to the increase of in power requirments, we also planned and upgrade the incomming power supply for the client
  • This project required full planning permission, this was complete by iab for the client.

Please find below two galleries of photos, first being the completed photo and second being photos as the project processed through different stages.