  • Barnet and Southgate College – Lab 106

    Contract Value:- £ 53,660
    Completed: – October 2014
    Location:- Southgate, London

    iab was approached by Ian Bartholomew from Barnet and Southgate College to provide a quotation for the total refurbishment of Lab 106 at the Southgate Campus

  • Harper Adams University – CELT Resource Centre

    Contract Value: £18,888
    Completed:- August 2014
    Location:- Newport, Shropshire

    We were approached by George+Tomos Architects to provide a budget price for an indicative layout for the refurbishment project for Harper Adams University

  • Sale Grammar – Office Insight Limited

    Contract Value:- £23,200
    Completed: – July 2014
    Location:- Sale, Manchester

    iab were invited to design, supply and install laboratory furniture for two refurbished teaching laboratories for Sale Grammar School.

  • Analytical and Chemistry Laboratory

    Completed:- May 2014
    Location:- Yorkshire
    .

    The project includes fixed floor mounted furniture to the Chemistry Area and fully cantilevered benching with mobile cabinets to the Analytical Laboratories

  • SGS Great Yarmouth

    Contract Value:- £34,400
    Completed: – April 2014
    Location:- Great Yarmouth, Norfolk

    This project at SGS Great Yarmouth consisted of the supply and installation of new cantilevered furniture with mobile under bench cabinets.

  • Derby University – T112/T116 – Tall Storage

    Contract Value:- £4127.00
    Completed:- October 2013
    Location:- Derby, Derbyshire

    We were approached by a regular client, Derby University, to design and build a tall storage unit that helped they survey department.

  • University of Derby – T112 to T116

    Contract Value:- £44,000
    Completed: – December 2013
    Location:- Derby, Derbyshire

    University of Derby requirements for two new teaching laboratories (T112 to T116). One of their needs was for a heavy duty draw arrangement for rock samples

  • Leicester MRC – Door and Drawer Front Replace – Phase 3 & 4

    Contract Value:- £10,960
    Completed: – October 2013
    Location:-Leicester, Leicestershire

    Following the successful completion of phase 1 and 2 in 2012, Leicester MRC came back to iab to complete the door and drawer replacement of 5 more labs

  • Wilberforce Sixth Form College

    Contract Value: – £325,000
    Completed: – September 2013
    Location: – Hull, East Riding, East Yorkshire

    iab were appointed by Wilberforce Sixth Form College as Principal Contractor. iab designed and refurbished five laboratories and four associated areas.

  • The Royal Marsden Nhs Ftrust – CMP Dark Room

    Contract Value: £4,300
    Completed:- August 2013
    Location:- Royal Marsden Hospital, Sutton London

    The Royal Marsden NHS Ftrust where looking to convert a small store room into a dark room for a group of sensitive microscopes.